Brick Paver Installation & Edging



Staging of product

A lot of paver projects will differ depending on gain access to, site conditions, task size and of course, the weather condition. These circumstances can have a total effect on your task from a timing stand point. Cautious factor to consider ought to be required to identify the time to begin the paver installation. Always aim to avoid any traffic or lessen on the prepared areas.

The supervisor or task supervisor ought to constantly have the products (sand/ pavers) dispersed around the job website for efficient and simple setups. Paver pallets/bundles need to be placed in a way not to disrupt the paver installation. The correct pallet/bundle placement can make the real project installation simpler and quicker by minimizing the overall labor of handling the product.

Brick paver patterns

Pavers can be placed in various patterns depending upon their shape. Each paver shape will generally have numerous various hatch patterns that are provided by the manufacturer.

The laying pattern and shape of the paver is really critical to the efficiency of the application. Professionals have to take into account the traffic weight loads on their paver tasks. 90 or 45 degree herringbone patterns are advised in all street and driveway applications, as these patterns will supply the maximum load support needed and will withstand sneaking from the turning of tires and braking or starting of automobile traffic. In most applications worldwide, it has actually been revealed that pavers laid in a herringbone pattern have performed effectively.

Pavers that are 60 mm (2 - 3/8 in) thickness are suitable for pedestrian applications. Pavers that are going to be utilized in business or industrial applications need to be 80 mm (3 - 1/8 in) in thickness.

Reference/starting point for brick paver installation

There are a number of conditions that identify the beginning point of a paver task.

When beginning to install pavers it is best to snap a true straight chalk line on the surface of the bedding sand or pull a real straight string line above the surface area of the bed linen sand at the completed elevation of the pavers This will assist as a guide for maintaining straight joint lines and will also enable the installer to make modifications in the positioning of the pavers.

Structures and concrete curbing are typically not straight and ought to not be utilized for developing straight joint lines. The usage of string lines is vital to figure out the real straightness of the edge. As the paver installation progresses, the string lines will help reduce the need for little trim pieces.

These will preserve a minimum joint width and permit the bed linen and jointing sand to get in in between each paver. Pavers with spacer bars are usually not laid in snug versus each other since a string line will provide consistent joint spacing.

Installation of brick pavers.

One of the most widely used approaches for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the true straight lines that you have pulled or above the bedding sand. This will give you a true and straight line off which to work. Once this row is established, you can continue to work outward into the field with the rest of the pavers. Always make sure to periodically check your joint lines to make sure they are straight and real. If not, changes to the pavers can be made as you continue setting up. Pavers needs to be set up hand tight. The best approach is to place a paver versus another one and let it move down into the bed linen sand. Do not kick or tap the pavers into location as this can toss your lines out of real straightness.

When installing pavers on a steep grade, they should be installed at the base of the grade going uphill. This will avoid the pavers from sneaking as they are being laid.

The finest way for installing pavers on large projects is to install them mechanically. There are a couple products a specialist must think about before installing pavers mechanically:

1.) Mechanical installers are only efficient in setting up pavers in specific patterns.

2.) The professional should make sure that the manufacturer can production and bundling pavers in the preferred pattern on the pallets for easy mechanical installation.

3.) Specialists may encounter a color blending scenario coming off the packages of pavers Poor color mixing could result in an irregular looking installation. The majority of producers are consistent with color blending on each package of pavers, however it is the professional's obligation to ensure correct mixing in the field.

Cutting procedures for brick pavers.

Contractors typically have 2 methods of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is geared up with a diamond blade. The diamond blade cut-off saw or brick saw will offer a much cleaner and more accurate cut. The majority of brick saws will have a pipe attachment on them which will allow the operator to cut the pavers damp. When cutting pavers wet, it will assist reduce dust and will prolong the diamond blades life. The operator of the brick saw need to always cut the pavers away from the surface area of the paver field when cutting wet, due to the fact that the pavers will develop a slurry that will stain the paver surface. Pavers that are cut should not fit tight, enough spacing must be available for jointing sand.

The brick saw operator needs to constantly wear the correct security that is needed for running a saw, such as eye, ear, breathing and hand defense ).

Edging types

Edge restraints play a major function in the general success of an interlocking pavement installation Edging restraints eliminate lateral motion of the pavers and hold the pavers tightly together. Specifically at the outer perimeter of the paver application, without an edging restraint, your task is guaranteed to stop working in time.

Typically produced edge restraints are the most commonly utilized by contractors. Produced edging restraints can vary from, plastic edging, steel and aluminum, timbers or precast concrete and stone.

Edging installation.

This could result in the migration of the bed linen sand and ultimate lateral movement of the pavers. If there is a possibility of losing bedding sand in between the pavers and the edge restraint, then geo textile fabric is suggested. When a space between the pavers and the edging surpasses 3/8" (10mm), then the area should be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The whole area that is to be compressed need to be swept clean of any foreign objects and particles that can trigger scratching or scuffing on the surface of the pavers.

In addition, it is essential that the very first compaction takes location before any jointing sand has been used to the pavers. If jointing sand is used to the pavers before compaction takes place, this can cause a bridging issue and will not permit the joints to be entirely filled with jointing sand. This can also prevent the pavers from being appropriately set into the bed linen sand.

When condensing the pavers, it is recommended that you make at least 2 passes in various instructions across the pavers. This will allow the pavers to be appropriately embeded in the bed linen sand and will force the bedding sand up into the joints from Koi Pond Florida the bottom of the pavers.

The compaction of the pavers is really critical to the final performance of the pavers. Failure to do correct compaction can result in deformations and pavement failure gradually.


Paver pallets/bundles need to be placed in a manner not to interfere with the paver installation. One of the most widely used techniques for the installation of pavers is hand installation of each paver. The operator of the brick saw need to constantly cut the pavers away from the surface area of the paver field when cutting wet, due to the fact that the pavers will create a slurry that will stain the paver surface. Edging restraints get rid of lateral motion of the pavers and hold the pavers securely together. When a space in between the pavers and the edging exceeds 3/8" (10mm), then the space should be filled with cut pavers.

Leave a Reply